Your dream Mountain Home in 7 uneasy steps

FeaturedYour dream Mountain Home in 7 uneasy steps

Step 1 : Buy the land.

Look at land options and finalize one. After that falls through at the last minute, find another. Clinch that and do the registration. Within six months someone will file a legal case against you. That person will claim to own the land you bought. This will happen despite your most thorough background checks and clean papers. Hire a lawyer and fight the case. Assuming a stay is not issued, proceed to step 2.

Step 2: Design the house.

Scour the internet, which will offer wonderful mountain home ideas, most of which will not be doable by the local building talent. Talk to local pahadi architects who are practical and will ensure you have a structurally solid house. But these folks are conservative and will insist on small windows. Unsatisfied with these architects, send your land survey files to architects all over the world (the Dutch are the current favourite). Over skype, you find their thinking resonant with yours. They will send you amazing designs which look brilliant in 3D renditions. They will, of course, do this without actually visiting your land. Do not discuss these designs with local people or you may discover that these designs are utterly impractical. They may also be insensitive to the ecology and to the local people, but thankfully you will never find out. Proceed with the most awesome architect at dollar rates.

Step 3 : Hire a contractor.

Look for a decent contractor. Talk to four pahadi contractors. Realize that they all seem rather shaky and imprecise in their quotations and work style, and offer no references. Look further for a “professional contractor”. Realize that evolution hasn’t created that species yet – except the Parsis who produced Hafeez Contractor. But he is actually an architect. Go figure. Hire the contractor who seems the best of the lot. Tell him (They’re all men) that your expectations are very high. Set milestones and link them to payment. Pay the advance. Start the project.

Step 4: Follow-up.

Call the contractor regularly. He will assure you that all is going well. Be shocked at the slow progress on your six-monthly visit of 1.27 days (average). Realize that the contractor cannot read the drawings, so he does his best based on what he could guess from the lines on the page. Be patient and civilized with the contractor. Increase your visit frequency to every 4 months, and extend each visit duration to 2.27 days (average). Start flying in on a rental helicopter to be more efficient. After the contractor misses the first 3 milestones, realize that things are not going as per your plan and the structure looks nothing like the glitzy 3D image you saw. Give the contractor a last deadline. He will miss it. The distressed look you wanted on your furniture is now on your face.

Step 5 : Fire the contractor.

After you fire him, you have three options.

A, Look for another contractor. All the best. They’re all equally bad.

B. Decide to do the project yourself. You might as well buy that chopper now instead of renting it.

C. Abandon the project. Take solace in the fact that the mountains are littered with half-finished dream-turned-nightmare projects.

Picture credit : Boulevard of broken dreams

With option A, loop back to steps 3-5. With option B, move to step 6. The best is Option C as you cut your losses.

Step 6: Become the contractor yourself.

Look for workmen in the mountains, sitting in the city. You will need people for civil work, carpentry, electric, plumbing, stone work, Metal work, Tile work, painting, solar, windmill and other myriad things. You curse the Dutch and drop the windmill from the grand plan.  Masons, carpenters and everyone else will promise you dates and times, and not show up. This will happen repeatedly as your hair thins, and the little that remains turns grey.  When they do turn up, they will give you lists of things to get, which you will duly order. Then they will tell you that they forgot one critical thing without which the work cannot proceed. Nothing is available locally, so you will lose 2 of your planned 2.27 days trying to get the missing bits. You will also be surprised at the contractor’s (Let’s call him your Ex – after all he screwed you) bad business sense. You discover that the margins are over 150%! Why would your Ex walk away? Check Linkedin for your Ex’s profile to see if he earlier worked at Fortis, Max or some other private hospital chain. Realize that your Ex is not on Linkedin.

Step 7: The house is finished. And so are you.

After some weeks as the travelling contractor, you have found some decent craftsmen in the mountains, and a good psychologist in the city. The psychologist is US returned and charges dollar rates. As the months pass you reduce your trips to the mountains and increase your visits to your shrink. She (they’re all women) says you should rest and advises against travel. You have developed a strange fear of heights. You now choose to take your 2.27 day vacations (average) by the sea. You put your mountain structure-thingy on the market and hope to sell it, and kiss your mountain-home dream goodbye. But you now have the bragging rights. At dinner parties you boast of the house you own in the Himalayas without making eye contact. Sometimes you throw up while doing so. People assume you have mixed your drinks.

Epilogue: After 4 years, your incomplete house still hasn’t sold, because rich, delusional city-dwellers all want to build their own dream house and not buy something half finished. Although they have no time to live in such homes, leave alone build them. You take a morphine prescription and visit the area again. The shell of your dreams is still standing, now over-run by creepers, weeds and algae. You stay at a nearby resort, paying a pittance for a lovely, well finished room with a grand view. The resort has great food, but somehow the taste in your mouth stays bitter. You try not to think about the return you would have got from putting the 0.37 Gazillion which your non-house cost into the stock market or bitcoins. You leave out the psychologist’s fees – subconsciously. You also try and not think about all the vacation time (n*2.27 days) you lost on the futile project.

Note : The above steps are based on a true story. Actually, many of them. I promised to tell you how to build a house. I never said you would actually live in it.

 

About the author : Chetan Mahajan* is a full-time writer and blogger who has been renting a house in the Himalayas for the last 3 years. He has also bought land and built his own house there over the last 2 years. At the time of going to press, he had just sacked his contractor. He still hasn’t moved in. Late at night, he sometimes applies Maybelline lipstick on his lips and whispers “because you’re worth it” to himself in the mirror. And pouts. His wife is a US licensed clinical psychologist who has a thriving in-house practice.